Vivek, P. and Saravanan, R. and Chandrasekaran, M. and Pugazhenthi, R. and Vinod Kumar, T. (2018) HEURISTIC FOR CRITICAL MACHINE ORIENTED BATCH SCHEDULING IN TWOSTAGE HYBRID FLOW SHOP. International Journal of Mechanical Engineering and Technology (IJMET), 9 (8). ISSN 0976-6359
50.pdf
Download (699kB)
Abstract
Hybrid flowshop is often encountered in numerous of manufacturing environment
in which the batch scheduling is occurred when multiple order have same due date
and such orders may be grouped together for processing to increase the machine
utilization. The increase of lot size may reduce the makespan and increases machine
utilization at the same time increases the complexity of handing and queue length. So
the critical machine oriented lot sizing and lot streaming procedure adopted in this
research. Batch scheduling of Two stage Hybrid flow shop (m = 2, M(1) = 1, M(2) =
2) is considered in this paper. Applied mathematical model presented. The
optimization of lot sizing was carried out by using simulation modelling and analysis.
Heuristic developed for scheduling. The groups of jobs orders were varied at five level
and found the heuristic solution outperformed for all levels.
| Item Type: | Article |
|---|---|
| Subjects: | Mechanical Engineering > Dynamics of Machines |
| Domains: | Mechanical Engineering |
| Depositing User: | Mr Prabakaran Natarajan |
| Date Deposited: | 20 Jan 2026 09:21 |
| Last Modified: | 20 Jan 2026 09:21 |
| URI: | https://ir.vistas.ac.in/id/eprint/12278 |